Gravel Calculator
Gravel tonnage from length, width and depth, with cubic yards and feet alongside for the delivery conversation.
Gravel to order
Note: Uses 1.4 US tons per cubic yard for crushed stone. Sands and rounded pebbles differ by about ±10 percent; add 10–15 percent for compaction on driveways.
Gravel by the Ton, Spread by the Foot
Like mulch, gravel is area × depth for volume — but it is sold by weight. The bridge is density: crushed stone runs about 1.4 tons per cubic yard. This calculator chains all of it: a 10 × 20 ft area at 3 inches is 50 cubic feet = 1.85 cubic yards = 2.59 tons. Order the tonnage, spread the volume.
Worked Example and Depth Choices
Driveways want 4–6 inches total built in compacted layers; paths 2–3 inches over a membrane; decorative ground cover as little as 1–2. Because every inch on a 200 sq ft area is about 0.86 tons, depth decisions are tonnage decisions. If the figure surprises you, that is the density talking: stone is heavy, and delivery trucks have legal payloads — a 10-ton order may arrive as two trips.
Compaction and Settlement
Loose gravel compacts by roughly 10–15% under traffic and weather. The calculator reports the loose volume to order; if you are building a driveway base to a finished level, add that compaction allowance on top rather than discovering the dip in November.
Frequently Asked Questions
How many tons of gravel do I need?
Volume first (area times depth), then weight at about 1.4 US tons per cubic yard for crushed stone. A 10x20 ft area at 3 inches is 1.85 yards, about 2.59 tons.
How deep should driveway gravel be?
Four to six inches total, built in compacted layers over a base. Paths need 2 to 3 inches; decorative cover as little as 1 to 2.
Why does the tonnage surprise people?
Stone is dense. Every inch of depth on 200 square feet is about 0.86 tons, and delivery trucks have payload limits — big orders may arrive in two trips.
Should I allow for compaction?
Yes on driveways: loose gravel compacts 10 to 15 percent under traffic. Order the loose volume plus that allowance to finish at the level you planned.